|
Inter-Roller Engineering clinches $25m contract
(2003-01-15)
INTER-ROLLER Engineering said yesterday it has secured a $25.3 million project
to redevelop the baggage handling system at Changi Airport's Terminal 1 as
well as to alter and add to Terminal 2's system.
The contract, together with previous contracts with Changi Airport's Terminal
3 and Bangkok's Suvarnabhumi Airport, 'will have a material impact on the
current year's performance', Inter-Roller said.
《The Straits Times》
<<< 回企业公关网
|