Inter-Roller Engineering clinches $25m contract

(2003-01-15)

INTER-ROLLER Engineering said yesterday it has secured a $25.3 million project to redevelop the baggage handling system at Changi Airport's Terminal 1 as well as to alter and add to Terminal 2's system.

The contract, together with previous contracts with Changi Airport's Terminal 3 and Bangkok's Suvarnabhumi Airport, 'will have a material impact on the current year's performance', Inter-Roller said.

《The Straits Times》

  

<<< 回企业公关网

 
读者反馈 | 封面 | 新加坡 | 国际/中港台/东南亚 | 财经 | 体育 | IT | 社论/言论/天下事 | 文萃 | 现在
新加坡报业控股版权所有